TEMPLE – SALADO SWITCH 34/1385 KV TRANSMISSION LINE PROJECT

To continue to provide safe and reliable electric service in this area, Oncor proposes to rebuild its existing Temple Switch – Salado Switch 345/138 kilovolt (kV) transmission line in Bell County on a combination of new lattice tower and monopole structures. The Project will connect a total of five existing and proposed Oncor switching stations:

 

1. Oncor’s existing Temple Switch, located approximately 0.75 miles southeast of the intersection of Loop 363 and State Highway (SH) 53 in Bell County;

2. Oncor’s existing Knob Creek Switch, located approximately 1 mile east of the intersection of U.S. Highway 190 and SH 95 in Bell County;

3. Oncor’s proposed Paramount Switch, which will be located approximately 0.7 miles south of the U.S. Highway 190 and SH 95 intersection in Bell County;

4. Oncor’s existing Fryers Creek Switch, located approximately 1 mile northwest of the intersection of SH 95 and Farm-to-Market Road (FM) 93 in Bell County; and

5. Oncor’s existing Salado Switch, located approximately 1.2 miles northeast of the intersection of Interstate Highway (IH) 35 and FM 2484 in Bell County.

 

The proposed project will be built entirely within existing Oncor ROW and will be approximately 15 miles long.

 

Voltage Type –     345 kV - Temple Switch to Salado Switch

138 kV - Temple Switch to Fryers Creek Switch

 

Structure Type – Monopole and Lattice Tower

 

Public participation meeting – Notice of the public participation meetings were published in the following newspapers on the specified dates.



Newspaper

County/Counties

Publish Date

Temple Daily Telegram

Bell

Friday, July 30, 2026

Belton Journal

Bell

Friday, July 30, 2026

One public meeting will be held for this project. 

  • THURSDAY, AUG. 13, 2026

    5:00 PM - 7:00 PM

     

    Harris Community Center    

    401 N. Alexander St.,

    Belton, TX 76513


Oncor will continue to accept landowner feedback by utilizing the Landowner Questionnaire. Please submit Questionnaires as soon as possible. A PDF copy of the Landowner Questionnaire is available here. Please submit via email to transmissionprojects@oncor.com.

 

Public Participation Meeting materials handed out at the Public participation meetings are available here.

PROJECT MAPS

You can download a copy of the application’s filed Alternative Route Links and Land Use Constraints map to locate your property in the link below.

INTERACTIVE MAP

Explore the preliminary transmission route links using our interactive map. This tool allows you to view route links, nearby parcels and other project details in an easy-to-navigate format.

Estimated Project Timeline

 

Application Filing – Anticipated in December 2026.

 

PUCT Decision – Anticipated by March 2027.

Oncor Representatives can be contacted regarding this Salado – Temple 345/138 kV Transmission Line Project at 214.486.5835 or transmissionprojects@oncor.com.