LONGSHORE SWITCH – DRILL HOLE SWITCH 765 KV TRANSMISSION LINE PROJECT

For Oncor Electric Delivery Company LLC (“Oncor”) to continue to provide safe and reliable electric service in the area, it proposes to build a new 765 kilovolt (kV) transmission line between the expansion of Oncor’s existing Longshore Switch and the expansion of Oncor’s existing Drill Hole Switch (Project). The Longshore Switch is located approximately 4.5 miles west of the City of Forsan in Howard County. The Drill Hole Switch is located 6 miles west of US 285 near the Culberson County/Reeves County Line. The proposed transmission line project will be approximately 160 miles depending on the route if approved by the Public Utility Commission of Texas (“PUCT”). The Proposed Transmission Line Project is currently planned for completion in 2029.

 

Voltage and Structure Type – The project includes a new 765 kV transmission line constructed on self-supporting, steel lattice towers.





Public Meeting – On May 08, 2025, notice of public meeting was published in The Van Horn Advocate, Pecos Enterprise, Stanton-Martin County Messenger, and Monohans News. On May 09, 2025, notice of public meeting was published in Andrews County News, and Big Spring Herald. On May 10, 2025, notice of public meeting was published in the Odessa American.

Public meetings have been set for the following dates and locations:

  • Monday, May 19, 2025

    BIG SPRING

    Ryan Hall

    605 N. Main Street Big Spring, Texas

    5:00 PM - 7:00 PM

  • Tuesday, May 20, 2025

    ODESSA

    Lawndale Community Center

    9201 Rainbow Drive, Odessa, Texas

    5:00 PM - 7:00 PM

  • Wednesday, May 21, 2025

    KERMIT

    Kermit Civic Center

    838 Telford Avenue, Kermit, Texas

    5:00 PM - 7:00 PM

Click here for a copy of the public meeting material.

PROJECT MAPS

 You can download a copy of the preliminary line map in the link below

Estimated Project Timeline

Application Filing – On December 11, 2025 Oncor filed an Application at the Public Utility Commission of Texas (PUCT) under Docket No. 59029 to construct and operate the proposed project. Click here for access to the docket on the PUCT Interchange.

 

PUC Decision – Anticipated June 2026.

Oncor Representatives can be contacted regarding the Longshore Switch – Drill Hole Switch 765 kV Transmission Line Project at 214.486.3434.