LIGGETT SWITCH TO SKYVIEW SWITCH 345 KV TRANSMISSION LINE PROJECT

For Oncor Electric Delivery Company LLC ("Oncor") to continue to provide safe and reliable electric service in the area, it proposes to rebuild a portion of its existing double-circuit 138 kV Liggett Switch to Handley Switch/Executive Parkway Substation transmission line and add a new 345 kV Liggett Switch – Skyview Switch line (the "Project") in Dallas and Tarrant Counties, Texas. Oncor's existing Liggett Switch is located south of and adjacent to West Rock Island Road, approximately one-quarter mile east of Roy Orr Boulevard in Grand Prairie, Texas. Oncor's proposed Skyview Switch, if approved, will be located approximately one-quarter mile southwest of the intersection of Trinity Boulevard and State Highway 360 in Fort Worth, Texas. All of the Project, except for the short segment terminating the new Liggett-Skyview 345 kV circuit into the proposed Skyview Switch, will be contained within existing right-of-way.

 

Voltage and Structure Type – The project includes replacing the existing Liggett Switch to Handley/Executive Parkway double-circuit capable lattice structures with triple-circuit capable monopole structures, and adding a new 345 kV circuit. The new 345 kV circuit will terminate into Oncor's proposed Skyview Switch, creating the Liggett Switch – Skyview Switch 345 kV transmission line.

 

Public Meeting – Notice of the public meeting will be published in the following newspapers on the specified date(s):

Newspaper

Publish Date

Fort Worth Star Telegram

Wednesday, July 1, 2026

Dallas Morning News

Friday, July 3, 2026


Public Meeting

One public participation meeting was held for the project.

  • Thursday, July 16, 2026

    Hilton Garden Inn DFW Airport South

    2001 Valley View Lane,

    Irving, TX 75061

     

    5:00 PM - 7:00 PM

Public Participation Meeting materials handed out at the Public Meetings are available here. Public meeting materials reflect information that was accurate at the time of the meeting and may be updated when the application is filed.

Oncor will continue to accept landowner feedback by utilizing the Landowner Questionnaire. Please submit Questionnaires as soon as possible. A PDF copy of the Landowner Questionnaire is available here. Please submit via email to transmissionprojects@oncor.com.

PROJECT MAPS

Maps with greater detail on the proposed route will be exhibited at the public participation meeting. 

INTERACTIVE MAP

Explore the preliminary transmission route links using our interactive map. This tool allows you to view route links, nearby parcels and other project details in an easy-to-navigate format.

Estimated Project Timeline

 

Application Filing – Anticipated in November 2026.

 

PUC Decision – Anticipated in February 2027

Oncor Representatives can be contacted regarding the Liggett Switch to Skyview Switch 345 kV Transmission Line Project at transmissionprojects@oncor.com or by phone at (972) 992-4251.