FRYERS CREEK SWITCH TO HARTRICK SWITCH TO SALADO SWITCH 138 KV TRANSMISSION LINE PROJECT

To continue to provide safe and reliable electric service in this area, Oncor Electric Delivery Company LLC (Oncor) is proposing to transfer the existing Fryers Creek Switch – Salado Switch 138 kV circuit in Bell County from existing lattice tower structures, which it currently shares with Oncor’s Temple Switch – Knob Creek Switch – Salado Switch 345 kV circuit, to new monopole structures. The new 138 kV monopole structures will be located adjacent to the existing lattice tower structures within Oncor’s existing right-of-way.

PROJECT MAPS

You can download or view a copy of the preliminary routing, as presented at the public participation meetings below.

INTERACTIVE MAP

Explore the preliminary transmission route links using our interactive map. This tool allows you to view route links, nearby parcels and other project details in an easy-to-navigate format.


Estimated Project Timeline

Application Filing – Anticipated to be filed in July 2026.

PUC Decision – Anticipated by October 2026.

Oncor Representatives can be contacted regarding the Fryers Creek to Hartrick to Salado 138 kV Transmission Line Project at 972-795-4882 or  transmissionprojects@oncor.com.



One public participation meeting was previously held for the project.

Public Participation Meeting materials handed out at the Public Meetings are available here. Public meeting materials reflect information that was accurate at the time of the meetings and may be updated when the application is filed.

  • Thursday

    March 19, 2026

    Harris Community Center

    401 N Alexander St.

    Belton, TX 76513

    5- 7:00 PM

 

Public Meeting - Notice of the public meetings was published in the following newspapers on the specified dates.

Newspaper

County

Publish Date

Temple Daily Telegram

Bell

3/12/2026

Belton Journal

Bell

3/12/2026