For Oncor Electric Delivery Company LLC (“Oncor”) to continue to provide safe and reliable electric service in the area, it proposes to construct a new 765 kilovolt (kV) transmission line from Oncor’s proposed Dinosaur Switch, located approximately 3 miles north of the City of Glen Rose in Somervell County, to Oncor’s existing Longshore Switch located approximately 4.5 miles west of the City of Forsan in Howard County, Texas (Project). The proposed transmission line project will be approximately 235-270 miles long depending on the route if approved by the Public Utility Commission of Texas (“PUCT”). The Proposed Transmission Line Project is currently planned for completion in 2028.
Voltage and Structure Type – The project includes a new 765 kV single-circuit transmission line constructed on self-supporting, steel lattice towers.