BIG HILL SWITCH TO SAND LAKE SWITCH 765 KV TRANSMISSION LINE PROJECT

For Oncor Electric Delivery Company LLC (“Oncor”) and Lower Colorado River Authority Transmission Services Corp. (“LCRA TSC”) to continue to provide safe and reliable electric service in this area, a new 765 kV transmission line is needed. The Project would connect a new LCRA TSC 765 kV Big Hill Substation, located in close proximity to LCRA TSC’s existing Big Hill 345 kV Substation 13 miles northeast of the City of Eldorado in Schleicher County, Texas, and the expansion of Oncor’s existing Sand Lake Switch, located 6 miles northeast of the City of Pecos in Ward County, Texas. The Proposed Transmission Line Project is currently planned for completion in winter 2030.

 

Voltage and Structure Type – The project includes a new 765 kV single-circuit transmission line constructed on self-supporting, steel lattice towers.




Public Meeting – Notice of the public meetings was published in the following newspapers on the specified dates.

NewspaperPublish Date
Crane NewsThursday, May 29, 2025
Ozona StockmanWednesday, May 28, 2025
San Angelo Standard-TimesThursday, May 29, 2025
Fort Stockton PioneerThursday, May 29, 2025
Big Lake WildcatThursday, May 29, 2025
Pecos EnterpriseThursday, May 29, 2025
Eldorado SuccessThursday, May 29, 2025
Midland Reporter-TelegramWednesday, May 28, 2025
Monahans NewsThursday, May 29, 2025

Three public meetings have been set for the following dates and times. 

  • Monday, June 2, 2025

    BIG SPRING

    Ryan Hall

    605 N. Main Street Big Spring, Texas

    5:00 PM - 7:00 PM

  • Tuesday, June 3, 2025

    SWEETWATER

    Marqueza Conference Center

    301 N. Oak Street Sweetwater, Texas

    5:00 PM - 7:00 PM

  • Wednesday, June 4, 2025

    STEPHENVILLE

    Cross Timbers Legacy Center

    830 S. Graham Avenue Stephenville, Texas

    5:00 PM - 7:00 PM

Public Participation Meeting materials handed out at the Public Meetings are available here.

PROJECT MAPS

 You can download a copy of the preliminary line map in the link below

Estimated Project Timeline

Application Filing – On January 15, 2026 Oncor filed an Application at the Public Utility Commission of Texas (PUCT) under Docket No. 59182 to construct and operate the proposed project. Click here for access to the docket on the PUCT Interchange.

 

PUC Decision – Anticipated in July 2026.

Oncor Representatives can be contacted regarding the Big Hill – Longshore 765 kV Transmission Line Project at 214.486.3560 or transmissionprojects@oncor.com.

LCRA TSC Representatives can be contacted at 512.578.1446 or BHSL@LCRA.org. Additional project details can also be found at www.lcra.org/BHSL.