To continue to provide safe and reliable electric service in this area, Oncor Electric Delivery Company LLC (Oncor) is proposing to construct a new, single-circuit 345 kV transmission line to be built on double-circuit lattice steel towers, with one circuit installed initially, between Oncor’s proposed McGee Switch in Crane County, Texas, and the proposed Sisters Solar POI in Ector County, Texas. The Proposed Transmission Line Project is currently planned for completion in Spring 2027.
Voltage and Structure Type – The project includes a new single-circuit 345 kV transmission line to be built on double-circuit lattice steel towers, with one circuit installed initially, approximately 4.72 miles in length.
Oncor will continue to accept landowner feedback by utilizing the Landowner Questionnaire. Please submit Questionnaires as soon as possible. A PDF copy of the Landowner Questionnaire is available here. Please submit via email to transmissionprojects@oncor.com.
Project Maps – You can download or view a copy of the preliminary routing, as presented at the public participation meeting below.