Three public participation meetings were held for the project.
Call 888.313.4747
(Available 24 hours a day/7 days a week)
General Inquiries/Service Requests:
Call 888.313.6862
E-mail contactcenter@oncor.com
(Monday-Friday, 8 a.m.-6 p.m. Central Time)
Call 888.313.4747
(Available 24 hours a day/7 days a week)
General Inquiries/Service Requests:
Call 888.313.6862
E-mail contactcenter@oncor.com
(Monday-Friday, 8 a.m.-6 p.m. Central Time)
Start New Electric Service: PowertoChoose.org
New Construction: Submit A Request
Existing Project Status: Get An Update
Understand Commercial Metering
Apply for Critical Load / Care Status
Energy Efficiency Identification Notice
MetersCheck My Meter Usage: Smart Meter Texas
Disconnect Or Reconnect A Meter Temporarily
PortalsLogin Interval Data Recorder Portal
Login To Competitive Retailer Information Portal
Register or Login Competitive Retailer Information Portal (CRIP) Portal
Register or Login to Aggregators, Brokers, Consultants (ABC) Portal
Retail Electric Provider (REP) Training
Retail Electric Provider (REP) Resources
SUPPLIER DIVERSITY Energy Efficiency Contractors (EEPM)Register or Login to Energy Efficiency Contractors (EEPM) Portal
Tree Pruning ContractorsLearn about our ongoing commitment to innovative solutions and services that benefit millions of Texans.
Renewables, Solar & MoreOncor works cooperatively with customers to ensure a safe and reliable interconnection of renewable energy sources to our system.
Energy EfficiencyFind information on a variety of energy efficiency and renewable energy incentive programs offered by Oncor.
For Oncor and LCRA TSC to continue to provide safe and reliable electric service in this area, a new 765 kV transmission line is needed. The Project would connect a new LCRA TSC 765 kV Big Hill Substation, located in close proximity to LCRA TSC’s existing Big Hill 345 kV Substation 13 miles northeast of the City of Eldorado in Schleicher County, Texas, and the expansion of Oncor’s existing Bell County East Switch, located 5.5 miles southeast of the City of Temple in Bell County, Texas. The Proposed Transmission Line Project is currently planned for completion in summer 2030.
Voltage and Structure Type – The project includes a new 765 kV single-circuit transmission line constructed on self-supporting, steel lattice towers.
Public Meeting – Notice of the public meetings was published in the following newspapers on the specified dates.
Three public participation meetings were held for the project.
Oncor and LCRA TSC will continue to accept landowner feedback by utilizing the Landowner Questionnaire. Please submit Questionnaires as soon as possible. A PDF copy of the Landowner Questionnaire is available here. Please submit via email to transmissionprojects@oncor.com or BCBH@LCRA.org .
Public Participation Meeting materials handed out at the Public Meetings are available here.
Project Maps – You can download or view a copy of the preliminary routing, as presented at the public participation meetings below.
Estimated Project Timeline
Application Filing – Anticipated in December 2025.
PUC Decision – Anticipated in June 2026.
Oncor Representatives can be contacted regarding the Bell County East – Big Hill 765 kV Transmission Line Project at 214.486.5216 or transmissionprojects@oncor.com
LCRA TSC Representatives can be contacted at 512.578.1445 or BCBH@LCRA.org. Additional project details can also be found at www.lcra.org/BCBH.
SOCIAL MEDIA AND WEB HOUSE RULES