West B – Moss 138 kV Transmission Line Project
Texas is continuing to increase the integration of renewable energy into the Texas electric market. Reliable electric facilities must be in place to support the increased levels of renewable energy and to provide efficient means for this power to reach electric consumers. As part of this on-going process, Oncor is proposing to build a new single circuit 138 kV transmission line project between the existing Moss Switching Station, located approximately 6 miles southwest of Odessa and 2 miles south of West Odessa, in Ector County, and the proposed West B Switching station located on State Highway 158, approximately 14 miles northwest of Odessa. The project will be approximately 14 miles long and located entirely within Ector County, Texas.
- Voltage and Structure Type - The project is proposed to be a 138 kV transmission line constructed on steel or concrete single poles.
Project Details
- Project One Pager - The One Pager includes a short description of the project, approval process and contact information.